shield

   

HomeNew discussion

New Project

full condition station Messages in this topic - RSS

ruckwarmy
ruckwarmy
Posts: 959


11 days ago
ruckwarmy
ruckwarmy
Posts: 959
4. arrives actually according to full condition station, use truckload the system that make a bank note makes a bank note. If consignor has demand, log, plank all can be pressed " one sheet two tickets " deal with, but plank must not fasten regulatory ticket with rapid movement. 5, consolidate material collects fees,Add according to cost price close 30% consolidate cost of raw materials closes in freight bill kernel. Goods holds rate of division make known to lower levels, hand over a comply with to carry out. 6, rapid movement is relevant seal,Use truckload after the system makes a bank note, freight bill and envelope do not need to be tagged again, build batch rapid movement to concern seal. 7, data statistic analysis,Hand over place daily the contrast that makes data of consign of good log, plank, business ministry has made the contrast of data of log of daily highway transportation, plank, sale division is daily collect. "commercial exterior stair treads non-slip,wpc or pvc exterior wall panel supplier,cheap composite wood wall cladding from china"
0 link






Powered by shield.com 2.0.02 © 2016